BETTER ENERGY DECISIONS. START WITH YOUR BILL.NORTH AMERICA · WORLDWIDE BILL ENTRY
THE TARIFF WORKBENCH

Two prices. One honest comparison.

Load a dated source or enter a competitor’s written offer. Keep the same usage, currency and period, then inspect fixed charges, time bands and one-time terms.

One baseline for both plans

The same kWh and period are used for both offers. Monthly fees use the entered months; annual fees use days/365. Tier limits are allowances for this entire period: adjust them from your bill. Time shares are editable examples, not interval measurements. Changing country or currency resets both offers.

PLAN A

Reference benchmark. GB average direct-debit price-cap reference.

Original publisher ↗ · checked 2026-10-26 · from 2026-10-01 to 2026-12-31. Review by 2026-11-25.

Omissions and eligibility to check
  • Region, payment-method and meter-specific differences
  • England, Scotland and Wales only; excludes Northern Ireland. This is an average benchmark, not a supplier offer or an exact local cap.
  • Electricity VAT is 0% in this source period. Do not add 5% VAT again.

Within stated period

PLAN B

Your entered scenario. Editable example; replace all inputs with a written offer.

Omissions and eligibility to check
  • Check all delivery, rider, tax and eligibility terms against the quote.
  • Example input; replace every amount with the written offer.

User-entered terms: verify dates

THE COMPONENTS YOU MODELED

See the trade-offs.

Modeled component · GBPOfgem direct-debit average · Q4 2026Example rate · enter your offer
EnergyGBP 105.28GBP 80.00
Energy discount (subtract)GBP 0.00GBP 0.00
Fixed chargesGBP 16.45GBP 0.00
Additional taxGBP 0.00GBP 0.00
Recurring componentsGBP 121.73GBP 80.00
One-time exit/switch feeGBP 0.00GBP 0.00
One-time credit (subtract)GBP 0.00GBP 0.00
Selected-period totalGBP 121.73GBP 80.00
GBP 41.73Plan B has the lower modeled total for this scenario.

Recurring component difference: GBP 41.73. A difference between modeled components is not a verified bill saving or a recommendation to switch.

Review remains incomplete. The displayed amounts are a planning subtotal. Complex demand charges, interval calendars, fuel adjustment formulas, negative-price tariffs, solar export settlement and tier-linked subsidies are not automatically reproduced.

Convert the rate before comparing.

0.250000 GBP/kWh. Unit conversion only; no currency exchange. A hundredths unit is not assumed for every currency.

Independent HAUSE research and calculation tools. Imported prices are a curated sample, not every supplier or a guaranteed eligible offer. Last source review: 2026-10-26. Methodology and limits →